Questions and Answers

Phoenix Pool Resurfacing FAQ

Common questions about finishes, draining, tile, timing and caring for a new pool surface.

Frequently Asked Questions

How often does a Phoenix pool need replastering?

It depends on the finish and how the water has been kept. Standard white plaster usually shows its age first. Pebble and quartz finishes tend to last longer. Rough texture, etching, stains that won't brush out and hollow spots are the usual signs it's time.

How long is my pool out of service during resurfacing?

Draining, prep and the new finish usually take several days, then the pool is filled without stopping. Tile work or repairs add time. Your estimate includes a day-by-day schedule.

Where does my pool water go when you drain it?

Into your home's sewer cleanout. The City of Phoenix says to drain there, not into the street, onto a neighbor's yard or into a wash, and recommends no more than 12 gallons per minute.

Should I replace the waterline tile at the same time?

If the tile is loose, cracked or crusted with calcium, yes. The pool is already empty, so it's the easiest time to do it, and new tile next to new plaster looks finished.

Which parts of Phoenix do you serve?

Pools across the City of Phoenix, including Kierland, Sunnyslope, Lookout Mountain, Stetson Valley, Sonoran Foothills and Mountain Park Ranch.

Where can I drain my pool in Phoenix?

The City of Phoenix says to drain or backwash into the sanitary sewer cleanout, not into the street, and not onto neighboring yards or into washes. We set the pump up that way on every job.

How fast can a pool drain into the sewer cleanout?

The City of Phoenix recommends no more than 12 gallons per minute, and says the safe rate may be lower. We check the house drains for backup while the pool empties.

Is it safe to leave a Phoenix pool empty?

Only briefly. An empty shell sits in direct sun, and a high water table can push on it, so we schedule prep and plastering to keep the pool empty for as short a time as possible.

What time of year is best for resurfacing?

Spring and fall are the most comfortable for curing and start-up. Summer work is possible with early starts, since new plaster cures better out of the hottest part of the day.

Still Have Questions?

Call us or request a free estimate.

Call 602-671-2383

Free estimate, no obligation